My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/02/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 03/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:39 AM
Creation date
3/1/2017 2:11:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/02/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Covenant Meadows <br />Preliminary Plat Exhibits <br />Engineering Review <br />February 22, 2017 <br />Page 3 of 3 <br />1. Trees to be removed must be clearly identified on the plan and in the tables. Add a column <br />to the tables identifying trees to be removed. <br />2. Tree protection fencing must be shown on the plan and installed as noted above. <br />Detail Sheets: <br />1. Detail sheets must be added to the plan set. <br />Stormwater Calculations <br />A stormwater summary report was provided. The report states the 100 year storm is retained <br />in the pond. The LRRWMO rules require sizing the basins for back to back 100 year storms <br />if there is no outlet. The ponds will need to be enlarged. <br />The LRRWMO requires volume reduction (infiltration) on all projects. The LRRWMO rules <br />require that infiltration basins empty completely within 48 hours after a 1" rainfall. The report <br />must be revised to include the 1 inch, 2 year, 10 year, 100 year and 100 year back to back rain <br />events. The HydroCAD report needs the Project Name and the Company Name on the page <br />headers. These reports become part of the City's permanent stormwater records. <br />The report states onsite soils in the mitigation area will be removed and replaced with more <br />permeable soils to promote infiltration. Details for the soil replacement must be included in <br />the plans. The Minnesota Pollution Control Agency has produced the free MIDS calculator for <br />evaluating stormwater practices like infiltration. The pond and infiltration basin must be <br />evaluated with the MIDS calculator. The stormwater report must include the infiltration <br />summary for each pond. <br />Draft boring logs were included with the stormwater report. A location map for the borings <br />was not included. <br />A project manual which includes the bid form, contract and specifications must be submitted <br />with the final plat. <br />Revised plans which address all of these changes must be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.