My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/02/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 03/02/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:39 AM
Creation date
3/1/2017 2:11:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/02/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Staff Feedback <br />A. YOLITE STREET CONNECTION <br />o Development of this site could trigger the construction of a 275' public roadway connection <br />(known as Yolite Street) --which would connect Sunwood Drive with Veterans Drive. Yolite <br />Street is the only potential public mid -block connection between Zeolite and Sapphire Street in <br />The COR (which are a half mile apart). Requiring the construction of Yolite Street is a policy <br />question for the City to answer —and is very important to this proposed development. Direction <br />is needed in order to move this project forward on this particular site. <br />o Stone Brook Academy is proposing to pay for 20% of costs related to Yolite Street (if the City <br />requires this road). Stone Brook would like to use the City's previously utilized cost share <br />arrangement on public roads located in commercial areas in The COR--which is a 60/40 split (60% <br />City, 40% developer). Stone Brook is proposing to pay 20%, as they are only utilizing one side of <br />the road. They are proposing the user on the other side of Yolite Street pay for the <br />remaining share of the 40% developer portion (i.e. 20%). <br />o Another option to consider is a private drive/ road connection (much like Casey's). It appears, <br />based on initial comments from the EDA/ PC/ CC, this is an option worth pursuing. In this case, <br />Stone Brook would propose a 50:50 cost share. <br />o The current COR Master Plan (left) does NOT call for a public road connection at Yolite Street. <br />The original COR Master Plan (right) DOES. <br />o Yolite has NOT been platted (ROW has not been secured) on the south side of Sunwood Drive <br />(property currently being considered by Stone Brook). Yolite HAS been platted (ROW has been <br />secured) on the north side of Sunwood Drive (to service a potential parking ramp). <br />Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.