Laserfiche WebLink
A total of four pavement corings were completed by WSB and Associates (WSB)to assist with <br /> the preparation of this report. In addition, thirteen soil borings were completed by Northern <br /> Technologies, Inc. (NTI). Both firms offered pavement design recommendations which were <br /> considered and incorporated to varying degrees while preparing this report. Copies of WSB's <br /> and NTI's reports are attached in Appendix C. <br /> This improvement project, which is listed in the City's current Capital Improvement Program, is <br /> proposed to be funded using a combination of street reconstruction bond proceeds and <br /> stormwater utility funds. <br /> Staff has not yet had an opportunity to discuss the proposed improvements with local property <br /> owners. However, upon Council acceptance of this report Staff will immediately contact local <br /> property owners for the purpose of explaining the proposed improvements and to request a <br /> meeting to discuss the proposed improvements in more detail and to gather their input on the <br /> project, including any information that should be explored in more detail during development of <br /> plans and specifications. Staff will then present this information to Council at the time plans and <br /> specifications are presented to Council for approval. <br /> This project would best be constructed as a stand-alone project and is necessary, feasible, and <br /> cost-effective from an engineering standpoint, and can be constructed as proposed herein. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 2 <br />