Laserfiche WebLink
4.2 Stormwater Treatment <br /> No stormwater retention and/or treatment improvements will be required as a result of this <br /> proj ect. <br /> 4.3 Water Main Improvements <br /> No watermain improvements are proposed with this project. <br /> 4.4 Sanitary Sewer Improvements <br /> No sanitary sewer improvements are proposed with this project. <br /> 4.5 Construction Methods <br /> The existing bituminous pavement section will be reconstructed using the FDR process outlined <br /> within this report. See WSB and Associates Pavement Evaluations and Recommendations report <br /> in Appendix C for additional details on the FDR process. <br /> 4.6 Private Utilities <br /> Staff has not yet met with the telephone, gas, power and cable utilities regarding this project. <br /> During preparation of plans and specifications, staff will meet with the private utility companies <br /> to discuss the proposed improvements as noted in the project schedule within this report. The <br /> alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br /> No impacts to power poles or street lights are anticipated with this project. <br /> Should any utility company indicate they wish to upgrade, replace and/or otherwise modify their <br /> services during this project, any such upgrades, replacements and/or modifications will be at the <br /> sole discretion and cost of the utility company. <br /> 4.7 Permits <br /> Permits that are anticipated to be required as part of the proposed improvements include: <br /> ■ MPCA General Stormwater Permit(NPDES).....Grading and Storm Water <br /> A stormwater permit from the Lower Rum River Watershed Management Organization will not <br /> be required with this project. <br /> 4.8 Right-of-Ways/Easements <br /> It is anticipated that all improvements will occur within existing City right-of-ways and/or <br /> easements, with the possible exception of tying into private driveways and yards. It is therefore <br /> not anticipated that the City will need to acquire additional permanent right-of-way or easements <br /> for this project. As such, costs for right-of-way or easement acquisitions are not included in the <br /> probable project costs. <br /> City staff will obtain any required right of entries. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 8 <br />