My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 01/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:00 PM
Creation date
3/7/2017 12:09:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil Engineer II Linton reviewed the location of the nearest water main and stated it would not <br /> be possible to loop the water lines. He stated staff would be analyzing the turnover rate of the <br /> water at Brookfield. <br /> Commissioner VanScoy questioned if the standard cul-de-sac requirements would be met. <br /> City Planner Anderson reported this was the case. <br /> Commissioner VanScoy asked how the negative impacts of the dead-end water lines could be <br /> mitigated. <br /> Community Development Director Gladhill described how the City would mitigate the water line <br /> concerns noting the hydrants were flushed at least twice a year. He commented the City also <br /> treated its water for high-iron content. <br /> Joe Jablonski, Lennar Corporation, appreciated the discussion being held by the Commission. He <br /> believed there was enough buildable space on Lot 2 for a home and future improvements. He <br /> understood the buffer setback was not buildable. He stated he has worked with longer cul-de-sacs <br /> in other developments and has had great success with the lines being flushed. <br /> Commissioner Surma thanked Mr. Jablonski for being present. He believed Lennar was a great <br /> partner to the City and has completed great work in the community. He requested that the line <br /> flushing be written into the Development Agreement to ensure this work was completed at least <br /> three times a year. <br /> Community Development Director Gladhill clarified the City would be conducting the <br /> maintenance work and flushing of the lines and not the developer. <br /> Commissioner Anderson questioned if there was any other alternative or shift that could be made <br /> to Lot 2. <br /> City Planner Anderson commented on the plans that had been discussed between staff and the <br /> applicant for Lot 2. He then offered the following findings if the Commission were to approve the <br /> variance to lot depth standards for Lot 2, Block 1. <br /> 1. The shape of the wetland boundary is fairly square and parallel to the house pad, compared <br /> to previous requests that have been denied. <br /> 2. The actual encroachment is much less than previous requests that have been contemplated. <br /> 3. The lot is shown with standard house pad dimension of 50' x 66'. <br /> 4. That a 25' front yard setback would eliminate the encroachment into the setback area. <br /> Motion by Commissioner VanScoy, seconded by Commissioner Surma, to close the public <br /> hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.