My WebLink
|
Help
|
About
|
Sign Out
Home
07/05/83
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1983
>
07/05/83
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:47:59 PM
Creation date
9/2/2004 9:49:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
07/05/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />170.0112K <br /> <br />b) <br /> <br />New substitutions or refurbishment of existing <br />substations shall be compatible in height, scale, <br />building materials, landscaping and signing~with <br />the surrounding natural environment or land uses. <br />Screening by natural means is encouraged and should <br />be compatible with the surrounding environment. <br /> <br />Pipelines. Pipelines and underground utility facilities <br />shall be subject to the following standards: <br /> <br />a) <br /> <br />b) <br /> <br />c) <br /> <br />Ail pipelines and underground facilities shall be <br />subject to the site planning requirements set forth <br />in Article <br />The facilities shall be located to avoid wetlands, <br />woodlands and areas of unstable soils; and <br />All underground placing of utility facilities and <br />pipelines shall be followed by revegetation and <br />rehabilitation to the conditions which existed on <br />site prior to development. <br /> <br />b) <br /> <br />Public and Private Roads and Railways. New roads and <br />railways crossing the Critical Area Corridor or routed within <br />the Critical Area Corridor shall meet the following <br />standards: <br /> <br />l) <br /> <br />Roads and railways shall be constructed to minimize <br />impacts on the natural terrain and natural landscape. <br /> <br />2) <br /> <br />3) <br /> <br />Cuts and fills are to be avoided. <br /> <br />Ail roads and railways shall be subject to the site <br />planning requirements set forth in Article . <br /> <br />New roads and railways shall not utilize the river <br />corridor as a convenient right-of-way for new arterials <br />or main lines. <br /> <br />New roads and railways shall be restricted to those <br />facilities needed to access existing and planned <br />residential, commercial and industrial uses. <br /> <br />All new roads and railways shall provide safe pedestrian <br />crossing points to allow access to the riverfront. Rest <br />areas, vistas and waysides shall be provided. <br /> <br />Riverfront Uses/Access <br /> <br />a) <br /> <br />Public Property. Public pedestrian access shall be provided <br />to the riverfront of all public property. <br /> <br />- 13 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.