My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/22/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 01/22/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:59:42 PM
Creation date
9/3/2004 8:47:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/22/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicant shall complete and occupy his building or facility and <br />all landscaping and other site work as per the stamped approved <br />final site plan no later than September 30, 1980. <br /> <br />/~plicant shall deposit with the City of Ramsey, a cashier's check, <br />irrevocnble letter of credit, performance bond, or other suitable <br />security acceptable to the City of Ramsey in the amount of 150 percent <br />(150%) of the cost of completing all landscaping improvements, asphalt <br />parking and driveway, outside lighting, curbing, wood mulch and mar- <br />king of fire land to insure access to the building for fire fighting <br />equipment. In add'ition the bond or escrow amount shall be in an <br />amount sufficent to guarantee two (2) full growing seasons following <br />the installation of landsca~eplantings as shown on the approved site plan. <br /> <br />Driveway construction and parking lot construction shall be: <br /> <br />Four (4) inches of Class V with two (2) inches of bit~minous mat <br />surfacing. The parking area shall be striped and shall contain the <br />number of spaces as shown on the approved site plan. Fire lanes shall <br />be marked and approved in accordance with the Anoka Fire Department <br />regulation. Said escrow amount shall be $ <br /> <br />Applicant acknowledges that failure to complete the improvements <br />described in paragraph #3 above by September 30, 1980, sh~ll result <br />in forfeiture of the financial guarantees provided to the City of <br />Ramsey and the City shall then be authorized to complete the i~prov- <br />ments from the escrow ~unds and the Applicant by execution of this <br />agreement hereby permits the City or its agent to come on his property <br />to complete the improvements <br /> <br />Applicant shall notify the City of Ramsey at least 72 hours in <br />advance of the date Applicant is ready for final inspection of his <br />site, and of his request for release of the financial guarantees <br />provided to the City of Ramsey in paragraph 3. <br /> <br />Construction of the building shall be as shown on the building design <br />plan submitted and as approved by the City Building Official. The <br /> <br />Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.