My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 02/12/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:00:54 PM
Creation date
9/3/2004 9:02:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft <br />To be returned to <br />Deloitte Haskins & Sells <br />and not <br /> _PRC <br /> <br />, MINNESOTA ' <br />)-EOT NO. 06-51-02857 <br /> <br />COMPLIANCE WITH GRANT TERMS AND CONDITIONS AND <br /> OTHER EDA LPW REQUIREMENTS <br /> <br />ATTACHMENT 2 <br /> <br />In connection with our examination of the financial statements <br />reported in Attachment 1, we have reviewed the terms and conditions <br />of the grant and EDA/LPW instructions and have performed tests of <br />City of Ramsey, Minnesota operations and records applicable to the <br />compliance requirements set forth in Parts II A and B of the audit <br />program in the Department of Commerce Audit Instructions for Local <br />Public Works Grants Under Title I of the Public Works Employment <br />Acts of 1976 and 1977. <br /> <br />In our opinion, for the items tested, conditions _were disclosed <br />which we consider to be matters of non-comPliance. Such conditions, <br />along with our recommendations for corrective action, ~re outlined in <br />the paragraphs beloQ. Except for these matters, the grantee complied <br />in all material respects with the applicable compliance matters <br />contained in Part II A of the audit program. Further, based upon <br />procedures performed in accordance with Part II B and, except for <br />those items of non-compliance shown below, nothing came to our <br />attention to indicate that. the grantee had not complied in all <br />material respects with all other applicable items listed in <br />Part II B of the audit program referred to above. <br /> <br />Paragraph 29 of the Standard Te~ms and Conditions requires the <br />grantee to submit one copy of as-built drawings to the Economic <br />Development Administration~ Such drawings have not yet been <br />completed. We recommend that the as-built drawings be completed <br />and one copy submitted to the Economic Development Administration. <br /> <br />Paragraph 29 of the Standard Terms and Conditions also requires the <br />grantee to submit a final acceptance report to the EDA. As noted <br />in Note C to the financial statements, the City has r~fused to sign <br />such a report pending resolution of a dispute with a contractor. <br />We recommend that the City continue its efforts to resolve this <br />dispute, and submit the final acceptance report to EDA upon such <br />resolution. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.