My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 03/11/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:01:18 PM
Creation date
9/3/2004 11:28:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'A':"N 'N" State Planning cy <br /> <br />STATEOFMINNESOTA <br />0 morandum <br /> <br />TO <br /> <br />FIIOM : <br /> <br />SUBJEC'f: <br /> <br />· Planning and Regulatory Agencies and <br /> Units of Government Within the <br /> River Corridor Critical Area <br /> Clifton Aichi nger,Coordinator ~~~ <br /> Critical Areas Program <br /> <br />Proposed Procedures for Reviewing Critical Area <br />Plans Amendments and Discretionary Actions <br /> <br />The Mississippi River Corridor Critical Area Designation <br />Order and the Critical Area Rules and Regulations require <br />that all proposed amendments to EQB approved Critical Area <br />plans and regulations be reviewed by the EQB prior to their <br />adoption at the local level. The designation order also <br />states that all plans and regulations should be re-evaluated <br />every two years and that the review procedure for amendments <br />and re-evaluations shall be the same as for the original <br />plans and regulations. <br /> <br />DATJ:. February 26, 1980- <br /> <br />PHONE: 296-2686 . <br /> ::fAo- ..... ,~.~; <br /> <br /> ~<'~ "'-- '~0 : <br /> <br />The Designation Order also requires that discretionary actions <br />on development permits be reviewed by the EQB. The Designa- <br />tion Order allows the EQB to limit the type of discretionary <br />permits to be reviewed. Through our experience with the <br />administration of the Mississippi River Corridor Critical <br />Area Interim Development Regulations we feel it is unnecessary <br />and undesireable to review all discretionary activities. <br />The attached procedures should clarify the types of actions <br />requiring review and the review process to be followed. <br />The procedures are identical to the Interim Development <br />Regulation administrative procedures except that the ability <br />of the Metrolopitan Council to order a public hearing was <br />removed. To provide for easier reference and ease of local <br />administration, the procedures for review of plan and regulation <br />amendments and procedures for review of disCretionary actions <br />have been combined into one administrative procedures document. <br />Also included are several definitions and the listing of the <br />types of discretionary, actions and amendments to be reviewed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.