My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 01/12/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 01/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:13:31 PM
Creation date
3/14/2017 10:57:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
01/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) What about creative options staff? <br /> • Below are some other creative options, proposed by the EDA and staff,for this particular site(the 5-acre <br /> Outlot B). Included below each map are comments from Stone Brook. <br /> �i <br /> 0 <br /> Stone Brook Comments: <br /> • Alternate A is physically too narrow,and too small to allow for what Stone Brook wants to accomplish <br /> (10,000 sf building plus a 1,500 sf playground). This was determined by their developer/architect. <br /> • Additionally,Stone Brook wants the focal point/front of their building to be pressed up against Sunwood <br /> Drive(to be prominent). This layout would physically force the focal point of their building to be located <br /> central to the site (and the side of their building to be pressed against Sunwood). They feel this doesn't <br /> meet the"theme/vision"of The COR. <br /> • Lastly,Stone Brook needs a round-about drop-off at their entrance—which requires a minimum 100'of <br /> site width (this remnant lot site is roughly 85'wide). Ideally,they want to have at least a 185'wide site. <br /> Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.