Laserfiche WebLink
EXECUTIVE SUMMARY <br /> The City of Ramsey identified the need to prepare for the development of a new business park <br /> within the City. A large area of privately owned green-field space located on the north side of <br /> Trunk Highway 10, west of Armstrong Boulevard, was identified for a future Ramsey Business <br /> Park. A report was prepared in late 2015 and early 2016 which reviewed traffic impacts and <br /> outlined infrastructure needs related to business park area. <br /> Development pressures have resulted in proposed land use changes for a portion of the study <br /> area. Phasing of the development activities in this area is also different than previously <br /> anticipated. As a result,the City requested an update to the previous analysis. <br /> This update primarily includes a study of traffic impacts resulting from the revised anticipated land <br /> uses in the business park. <br /> The updated analysis indicates the required improvements within the study area can be <br /> implemented based on the phasing plan currently proposed. Each series of improvements for <br /> Bunker Lake Boulevard and Puma Street can be implemented as the properties immediately <br /> adjacent to the roadways are developed. <br /> Future improvements required to serve the area include: <br /> • Expansion of Bunker Lake Boulevard (west of Armstrong Boulevard)to a four lane section, <br /> • Expansion of the west end of Bunker Lake Boulevard and Puma Street to three lane sections, <br /> • Construction of right turn lanes at entrances, <br /> • Extension of an 18-inch sanitary sewer line along Bunker Lake Boulevard and Puma Street, <br /> • North of the Puma Street/Bunker Lake Boulevard intersection, construction of a lift station, <br /> • North of the lift station, extension of a 12-inch sanitary sewer gravity main, <br /> • Extension of a 16-inch water main along Bunker Lake Boulevard and Puma Street, <br /> • Use of regional rate control basins to maintaining existing flow rates into the COR, <br /> • Installation of street lighting, trails/sidewalks, and landscaping consistent with City Policy, <br /> and <br /> • Obtaining of ROW required for improvements during the platting process. <br /> Total costs for all public improvements are approximately$6,819,000, assuming the project is <br /> constructed according to the phases described in this report.The costs are considered project <br /> costs and include 30%contingencies and project development costs (administrative, engineering, <br /> and fiscal). <br /> Costs related to trunk sanitary sewer and trunk watermain were assumed to be paid from City <br /> utility funds.The City will need to develop a funding strategy for the remaining $5,419,000 in <br /> public improvement costs. <br /> The information presented in this report is intended to allow for discussions with property owners <br /> and developers, as well as allow the City to begin considering funding options. <br /> Prepared by:Bolton&Menk,Inc. <br /> Future Business Park—City of Ramsey Page 1 <br />