My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/08/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 04/08/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:01:49 PM
Creation date
9/3/2004 12:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/08/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction since the street width proposed generally follows the present street <br />section width. <br /> <br />The street section proposed as shown on Exhibit B consists of a 3 inch gravel <br />base,with a 1½" bituminous surface. This section is equivalent to a 5-ton design <br />in accordance to the Department of Transportation specifications. This section <br />has been previously used in the city and other communities With no detrimental <br />effects. It is estimated that this 'street section has a life expectancy of 15 <br />years with minimal maintenance. <br /> <br />The proposed construction would not include any driyeway construction with the <br />exception of a one foot apron, which would be provided on all driveWays to pro- <br />tect the edge of the plavement. It would be the homeowner's responsibility t6 <br />extend existing bituminous or concrete'driveways to match the street. <br /> <br />Storm Dr6ina99 ~Improvement: , <br /> <br />To alleviate the flooding problem on Limonite St. N.W., it is proposed tocon- <br />struct a storm sewer to'Kamacite Street N.W. as shown on Exhibit A~ Since this <br />is ~ localized drainage problem, only the benefited properties would be assessed. <br /> <br />In addition to the storm sewer proposed, several cross streets culverts and minor <br />ditch grading and cleaning of existing cross-streets culverts are proposed at <br />this time. This work .is proposed to be included in the costs for upgrading the <br />streets. <br /> <br />Some existing driveways presently do not have driveway culverts. While not all <br /> <br />driveways would need a driveway culvert, those lots which presently may cause <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.