My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 11/21/2016
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2016
>
Agenda - Environmental Policy Board - 11/21/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:56:24 AM
Creation date
3/14/2017 11:37:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
11/21/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Water Supply Plan Template July 8, 2016 <br /> MN Unique Well#or Type of monitoring Monitoring program Frequency of Monitoring Method <br /> Surface Water ID point monitoring <br /> 580313 0 production well ❑ routine MDH ❑ continuous 0 SCADA <br /> ❑ observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling 0 monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> 593672 0 production well ❑ routine MDH ❑ continuous 0 SCADA <br /> ❑ observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling 0 monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> 706840 0 production well ❑ routine MDH ❑ continuous 0 SCADA <br /> ❑ observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling 0 monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> 731127 ❑ production well ❑ routine MDH 0 continuous 0 SCADA <br /> 0 observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling ❑ monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> 743832 0 production well ❑ routine MDH ❑ continuous 0 SCADA <br /> ❑ observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling 0 monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> 713833 0 production well ❑ routine MDH ❑ continuous 0 SCADA <br /> ❑ observation well sampling ❑ hourly ❑ grab sampling <br /> ❑ source water 0 routine water ❑ daily ❑ steel tape <br /> intake utility sampling 0 monthly ❑ stream gauge <br /> ❑ source water ❑ other ❑ quarterly <br /> reservoir ❑ annually <br /> Water Level Data <br /> A water level monitoring plan that includes monitoring locations and a schedule for water level <br /> readings must be submitted as Appendix 2. If one does not already exist, it needs to be <br /> prepared and submitted with the WSP. Ideally, all production and observation wells are <br /> monitored at least monthly. <br /> Complete Table 9 to summarize water level data for each well being monitored. Provide the <br /> name of the aquifer and a brief description of how much water levels vary over the season (the <br /> difference between the highest and lowest water levels measured during the year) and the <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.