Laserfiche WebLink
Local Water Supply Plan Template July 8, 2016 <br /> Table 11.Status of Wellhead Protection and Surface Water Protection Plans <br /> Plan Type Status Date Adopted Date for Update <br /> WHP ❑ In Process August 11,2009 August 2019 <br /> ❑X Completed <br /> ❑ Not Applicable <br /> SWP ❑ In Process <br /> ❑ Completed <br /> ❑X Not Applicable <br /> F. Capital Improvement Plan (CIP) <br /> Please note that any wells that received approval under a ten-year permit, but that were not <br /> built, are now expired and must submit a water appropriations permit. <br /> Adequacy of Water Supply System <br /> Complete Table 12 with information about the adequacy of wells and/or intakes, storage <br /> facilities, treatment facilities, and distribution systems to sustain current and projected <br /> demands. List planned capital improvements for any system components, in chronological <br /> order. Communities in the seven-county Twin Cities metropolitan area should also include <br /> information about plans through 2040. <br /> The assessment can be the general status by category; it is not necessary to identify every <br /> single well, storage facility, treatment facility, lift station, and mile of pipe. <br /> Please attach your latest Capital Improvement Plan as Appendix 4. <br /> Table 12.Adequacy of Water Supply System <br /> System Component Planned action Anticipated Notes <br /> Construction <br /> Year <br /> Wells/Intakes ❑ No action planned -adequate 2021 based <br /> ❑ Repair/replacement on current <br /> ❑X Expansion/addition demands and <br /> future <br /> projections <br /> Water Storage Facilities ❑X No action planned -adequate <br /> ❑ Repair/replacement <br /> ❑ Expansion/addition <br /> Water Treatment Facilities ❑X No action planned -adequate <br /> ❑ Repair/replacement <br /> ❑ Expansion/addition <br /> Distribution Systems ❑ No action planned -adequate Based on <br /> (pipes,valves,etc.) ❑ Repair/replacement development <br /> ❑X Expansion/addition needs <br /> Pressure Zones ❑X No action planned -adequate <br /> ❑ Repair/replacement <br /> ❑ Expansion/addition <br /> 25 <br />