Laserfiche WebLink
Item-by-item guidance Chapter <br /> Category Specific Guidance: <br /> Non-metallic Mineral Mining(Subp 12):The site plan and description must include the boundaries, depths, buffer areas, <br /> access roads,fixed equipment locations, wells,ponds, discharge points, and any other significant features of the mine. The <br /> plan and schedule of development should be indicated. Proposed hours of operation should be indicated. The reclamation <br /> and end use plan should be discussed. <br /> Residential Development(Subp 19 and l9a): The project description should include any infrastructure such as streets, <br /> permanent stormwater management structures, sewers, water mains or utility lines constructed to serve the residences.In <br /> addition, the impacts of any such infrastructure must be described here and addressed throughout the worksheet. The items <br /> Future and Previous stages of another project frequently apply to residential projects because projects are often built in <br /> stages. Theproposer andRGUshould be sure that ruleprovisions regarding `phased actions"are complied with as <br /> discussed in Chapter 2 of the Guide to Minnesota Environmental Review Rules. <br /> Highway projects(Subp 22):The description should focus on the physical characteristics of the project rather than <br /> programmatic aspects, such as the reasons for the project, and should include information about construction methods and <br /> the schedule for construction.Information relating to other alternatives considered can be provided. <br /> Barge fleeting(Subp 23): The project description should include any onshore support facilities.Address the compatibility of <br /> any onshore support facilities with shoreland,floodplain, or scenic river zoning. <br /> Marinas(Subp 25): The project description must include all onshore ancillary facilities as well as the marina facility itself. <br /> Address the compatibility of the onshore facilities with shoreland,floodplain, or river zoning. <br /> Stream Diversion(Subp 26):An overview of the project should be presented and how it will be constructed.Details of the <br /> construction should be presented at item 11.b.iv.If the stream is surrounded by designated shoreland,floodplain, wild or <br /> scenic river zones, discuss the project compatibility with the requirements of applicable zoning codes. <br /> Natural Areas(Subp 30):Ensure the compatibility with the management plan for the natural area being affected. <br /> Communication Towers(Subp 33):The description should include information on guy wires, ancillary facilities such as <br /> equipment sheds or fuel tanks, and access roads. Describe any measures taken to minimize impacts such as special lighting, <br /> modified design or choice of location. <br /> Environmental Quality Board EAW Guidelines—October 2013 14 <br />