My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 01/18/2017
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2017
>
Agenda - Environmental Policy Board - 01/18/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:52:46 AM
Creation date
3/14/2017 11:40:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
01/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item-by-item guidance Chapter <br /> If large amounts of soils will be excavated,the EAW should identify the types involved,quantities,to where <br /> they will be relocated and how they will be used. <br /> If soil borings have been conducted,it may be necessary for the RGU to have this information,especially if <br /> the project may have potential to contaminate the soils or ground water,including projects involving use of <br /> on-site sewage treatment by septic tanks and drainfields. <br /> Legislation in 2013 established a new mandatory category for silica sand projects. In addition to the EAW content <br /> already required under statute and rule, an environmental assessment worksheet for silica sand projects must <br /> include "a hydrogeologic investigation assessing potential groundwater and surface water effects and geologic <br /> conditions that could create an increased risk of potentially significant effects on groundwater and surface water." <br /> There are interrelationships among geology,groundwater and surface water in some areas,particularly where <br /> karst conditions exist.Karst is typically found in the southeastern quarter of the state and should be carefully <br /> considered when siting a facility or stormwater ponds. EAWs for projects with karst conditions should also <br /> include information on shallow ground water,exposed bedrock,or karst conditions that include sinkholes or <br /> disappearing streams. It is important that information regarding geology and water in EAW Items 10 and 11 <br /> account for those interrelationships. <br /> Category Specific Guidance: <br /> Highway projects(Subp 22):For lengthy projects with a variety of adjoining land uses,provide a general overall <br /> description of the land uses and more detail for those areas where there may be conflicts or the land uses are more <br /> sensitive. <br /> Natural areas(Subp 30):Answer if grading or other erosion-causing activities will occur. <br /> Environmental Quality Board EAW Guidelines—October 2013 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.