My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 01/18/2017
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2017
>
Agenda - Environmental Policy Board - 01/18/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:52:46 AM
Creation date
3/14/2017 11:40:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
01/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glossary <br /> Glossary <br /> Where noted,definitions can be found in Minnesota Statutes 116D and Minnesota Rules 4410.0200. Other definitions have <br /> been included based on the context of the document to provide guidance on the Environmental Review program. <br /> Alternative Urban Areawide Review Discretionary review <br /> A substitute review process based on review of Environmental review ordered by any government <br /> development scenarios for an entire geographic area unit,usually in response to a citizen petition,where <br /> rather than for a specific project. (Minn. R.4410.3610 review is not mandatory. <br /> Subp 1) <br /> Environmental Assessment Worksheet <br /> Connected actions A document providing basic information about a <br /> Two or more projects that are related,interdependent project that may have the potential for significant <br /> parts of a larger whole. (Minn. R.4410.0200 Subp 9c) environmental effects. The EAW is prepared by the <br /> Responsible Governmental Unit to determine whether <br /> Construction an Environmental Impact Statement should be <br /> Any activity that directly alters the environment, prepared. (Minn.R. 4410.0200 Subp 24) <br /> excluding surveying or mapping. (Minn. R. <br /> 4410.0200 Subp 10) Environmental Impact Statement <br /> A thorough study of a project with potential for <br /> Cumulative potential effects significant environmental impacts,including <br /> The effect on the environment that results from the evaluation of alternatives and mitigation. (Minn. R. <br /> incremental effects of a project in addition to other 4410.0200 Subp 26) <br /> projects in the environmentally relevant area that <br /> might reasonably be expected to affect the same Environmental Quality Board <br /> environmental resources,including future projects State agency that adopts environmental review rules, <br /> planned or for which a basis of expectation has been monitors their effectiveness and revises as <br /> laid,regardless of who undertakes the projects or appropriate; provides technical assistance to interpret <br /> what jurisdictions have authority over the projects. and apply rules.(Minn. Stat. §116C.04) <br /> Significant cumulative potential effects can result <br /> from individually minor projects taking place over a EQB Monitor <br /> period of time. In making these determinations,the Biweekly publication of the Environmental Quality <br /> RGU must consider: whether applications for permits Board,lists deadlines for comments on Environmental <br /> have been filed with any units of government; Assessment Worksheets,Environmental Impact <br /> whether detailed project plans and specifications have Statements and other notices. (Adapted from Minn. R. <br /> been prepared;whether future development is 4405.0100 Subp 6) <br /> indicated by adopted comprehensive plans or zoning <br /> or other ordinances;whether future development is Expansion <br /> indicated by historic or forecasted trends; and any A facility's capability to produce or operate beyond <br /> other relevant factors. (Minn. R.4410.0200 SubpI la.) its existing capacity,excluding repairs or renovations <br /> that do not increase capacity. (Minn. R. 4410.0200 <br /> Day Subp. 28) <br /> Either calendar or working day depending on the <br /> timeframe listed for a specific event. If the text lists Mandatory review <br /> 15 or fewer days,they are working days; calendar Legally required review,established by the <br /> days are 16 or more days. The first day of any time Environmental Quality Board through rules <br /> period is not counted but the final day is counted.The authorized by the Environmental Policy Act. <br /> last day of the time period ends with normal business <br /> hours,generally at 4:30 p.m. Working days exclude Mitigation <br /> Saturdays, Sundays and legal state holidays. (Minn. A. avoiding impacts altogether; <br /> R. 4410.0200 Subp 12) B.minimizing impacts by limiting the project; <br /> C.rectifying impacts by repairing,rehabilitating,or <br /> Environmental Quality Board EAW Guidelines—October 2013 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.