Laserfiche WebLink
Review File: Covenant Meadows <br /> Preliminary Plat Review: Tree Preservation and Landscaping <br /> February 9,2017 <br /> Page 2 of 2 <br /> consult with the Certified Arborist that prepared the Tree Preservation Plan to prepare a plan <br /> that identifies the precautionary steps to be taken on site to protect oak trees from Oak Wilt. <br /> This should be included with the submittal of the Final Plat. <br /> Required Sheet Revisions <br /> Sheet G1 (Preliminary Grading Plan) <br /> • Revise to show tree preservation fence. <br /> • Tree preservation fence must be installed and then approved by City prior to any <br /> clearing work. <br /> • Add note stating that any clearing within oak stands shall be performed prior to April 15 <br /> or after July 15 to minimize exposure to and/or introduction of oak wilt. <br /> • Add precautionary steps to be taken on site to protect oak trees from Oak Wilt and/or <br /> reference said plan and that it is incorporated by reference. <br /> Sheet L1 (Tree/Landscape Plan) <br /> • Add note stating that any clearing within oak stands shall be performed prior to April 15 <br /> or after July 15 to minimize exposure to and/or introduction of oak wilt. <br /> • Add precautionary steps to be taken on site to protect oak trees from Oak Wilt and/or <br /> reference said plan and that it is incorporated by reference. <br /> • Revise to show tree preservation fence. <br /> Sheet T1 (Tree Plan) <br /> • Add note stating that any clearing within oak stands shall be performed prior to April 15 <br /> or after July 15 to minimize exposure to and/or introduction of oak wilt. <br /> • Add precautionary steps to be taken on site to protect oak trees from Oak Wilt and/or <br /> reference said plan and that it is incorporated by reference. <br /> • Revise to show tree preservation fence. <br />