My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 02/09/2017
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2017
>
Agenda - Parks and Recreation Commission - 02/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:52:36 PM
Creation date
3/14/2017 11:56:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
02/09/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. The proposed roundabout shall include enhanced pedestrian safety measures <br /> above and beyond standard/minimum improvements. <br /> iii. Park Dedication credit maybe applied to the'leg' of the roundabout which would <br /> serve as the Lake Itasca Park entrance <br /> d. Greenway Trail Connection <br /> i. Construct 10' trail adjacent to the wetland in the north edge of the plat, and <br /> exchange land for Hageman parcel (4 acres of earlier Park Dedication to the city) <br /> ii. Explore creation of area of linear open water (visual amenity for townhomes), <br /> along trail. <br /> iii. Consider plaza adjacent to greenway trail and the Mississippi River Trail (Puma <br /> Street)for bench, drinking fountain, enhanced landscape, etc. <br /> e. Advance park improvements in The COR <br /> i. Identify within the Development Agreement, specified improvement E.g. <br /> Schematic Design for the water-centric park, plans and specifications for the <br /> proposed splash pad etc. <br /> Regional Infrastructure <br /> The section will be populated at future steps. <br /> • Regional Infrastructure for the project area is defined as Bunker Lake Boulevard and Puma Street. <br /> o Roadway <br /> o Water Trunk (paid for by normal Trunk Fees) <br /> o Sanitary Trunk(paid for by normal Trunk Fees) <br /> • An additional suggested improvement is the Alpine Drive Roundabout (Staff recommended <br /> exploration only). <br /> • The City supports some degree of cost share for these improvements. The specifics shall be <br /> negotiated with future steps. <br /> • The Developer shall be responsible for the final design and construction for portions adjacent to <br /> the project. <br /> For specific detail on this policy topic, please review the Infrastructure Study completed by Bolton and <br /> Menk.This section will be completed upon completion of the Revised Infrastructure Study by Bolton and <br /> Menk and subsequent policy direction from the City Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.