My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/05/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 01/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:11 AM
Creation date
3/14/2017 12:27:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/05/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion Carried. Voting Yes: Chairperson Bauer, Commissioners VanScoy, Surma, and Nosan. <br /> Voting No: Anderson and Brauer. Absent: None. <br /> 5.04: Public Hearing: Consider Interim Use Permit for Gravel Parking Lot Expansion at <br /> 7575 Highway 10 NW; Case of M&G Trailers <br /> Public Hearing <br /> Chairperson Bauer called the public hearing to order at 8:20 p.m. <br /> Presentation <br /> Community Development Director Gladhill presented the staff report stating this case was <br /> amended on November 29, 2016. He explained the City has received a request for an expansion <br /> of a gravel parking/storage area at 7575 Highway 10 NW. The request has been made by M & G <br /> Trailers. These parking and storage areas are ordinarily required to consist of asphalt or concrete. <br /> However, in acknowledgement of impacts of future Highway 10 improvements, the City has <br /> adopted interim development standards for impacted parcels. In this case, the Highway 10 Access <br /> Planning Study call for a complete acquisition of this parcel in order to remove a private, direct <br /> access to Highway 10. A timetable has not been set for acquisition, and is an 'opportunity driven' <br /> priority. In other words, unless a safety hazard presents itself, confirmed by accident data, the <br /> acquisition will likely be one of the last implementation steps of the plan that spans the cities of <br /> Anoka, Ramsey, and portion of Elk River. <br /> Community Development Director Gladhill reported the use of gravel in these interim areas is <br /> limited to expansions of existing paved lots. This would be the second expansion of this lot, <br /> previously approved via Interim Use Permit. The expansion is within the 150% the size of the <br /> paved lot as allowed by City Code. The proposal generally meets setback requirements, with <br /> amendments outlined in City Code. The Applicant must also provide a Landscape Plan to be <br /> reviewed by Staff prior to issuing the grading permit. The request also requires the approval of <br /> the Lower Rum River Watershed Management Organization. Key discussion topics: <br /> • Code allows for gravel parking and storage areas in areas impacted by future public <br /> improvements or acquisition. <br /> • This site is identified as a necessary acquisition in the Highway 10 Access Planning <br /> Study. <br /> • Design requirements include,but are not limited to (copy of section of code attached): <br /> 0 20 foot setback from front property line. <br /> 0 Cannot exceed 150%the size of the paved portion of the lot. <br /> 0 Proper grading and drainage (review complete). <br /> Planning Commission/December 1, 2016 <br /> Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.