My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/05/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 01/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:27:11 AM
Creation date
3/14/2017 12:27:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/05/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. That the B-2 Highway Business District specifies that exterior wall finishes shall consist of <br /> face brick, stucco, glass, natural stone, specifically designed pre-cast concrete units whose <br /> surfaces have been integrally treated with an applied decorative material or texture, factory <br /> fabricated panel materials if the panel material is to be of the aforementioned finishes, or other <br /> materials as approved by the Planning Commission and City Council. <br /> 12. That past practice of the City has been to consider membrane type structures as a violation of <br /> City Code based on the exterior finish material. <br /> 13. That Building Code defines a temporary structure as a structure that is erected for less than 180 <br /> days. <br /> 14. That temporary structures are still subject to the provisions of the International Fire Code and <br /> Minnesota Building Code. <br /> 15. That a Temporary Tent/Canopy Permit is required to erect this Structure. <br /> 16. That the proposed duration of the Structure (approximately 120 days) exceeds that of a <br /> Transient Merchant as defined in City Code Section 26-549 (maximum of sixty [60] days). <br /> 17. That the City's Strategic Plan includes a Strategic Initiative to improve the image of key <br /> corridors, including Highway 10, and that the proposed use appears to conflict with this <br /> initiative. <br /> 18. That interim use permits are temporary in nature and must be aligned with a specific ending <br /> date or event. <br /> 19. That the Applicant has stated that the Structure would be needed through May 14, 2017 (the <br /> weekend of fishing opener). <br /> 20. That the proposed use does/does not conform to the zoning regulations within the B-2 Highway <br /> Business District. <br /> 21. That the date or event that will terminate the use can/cannot be identified with certainty. <br /> 22. That permission of the use will/will not impose additional costs to the public if it is necessary <br /> for the public to take the property in the future. <br /> 23. That the proposed use will/will not adversely impact traffic in the area. <br /> 24. That the proposed use will/will not be dangerous or detrimental to persons residing or working <br /> in the vicinity of the use or to the public welfare. <br /> 25. That the proposed use will/will not substantially or adversely impair the use, enjoyment or <br /> market value of surrounding properties. <br /> RESOLUTION #17-01-008 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.