Laserfiche WebLink
Public Works Committee 5. 2. <br /> Meeting Date: 10/18/2016 <br /> By: Tim Gladhill, Community Development <br /> Title: <br /> Consider Work Order for Sunwood Drive Roundabout Streetscape Design <br /> Purpose/Background: <br /> At the September 27, 2016 Work Session,the City Council requested a discussion on streetscape design for the <br /> Sunwood Drive Roundabout in The COR. This discussion occurred as part of Council Input. Consensus of the City <br /> Council was to pull this improvement project from the broader'Corridor Improvement'initiative of the Strategic <br /> Plan,which aims to improve the viewshed of key corridors and nodes. <br /> The discussion from the September 27 Work Session is below: <br /> [Kuzma]stated that there was past discussion with doing something at the roundabout and noted that he would like <br /> to bring back that item for discussion. <br /> City Administrator Ulrich noted that item was lumped into the corridor discussions but stated that if that is a high <br /> priority item, it could be pulled out for separate discussion. He confirmed that staff could bring that forward for <br /> future discussion. He complimented the public works crews that did a great job mowing around The COR areas this <br /> summer. <br /> Timeframe: <br /> 30 minutes <br /> Observations/Alternatives: <br /> In order to frame the discussion, Staff has obtained a quote from WSB for Streetscape Design Services to prepare <br /> Concept Layout and Engineer's Estimates. The total amount for the services would be a not to exceed $11,989.00. <br /> This would allow the City Council to evaluate alternatives and clarify the scope and acceptable costs to achieve the <br /> desired outcome. <br /> This step would not take the City all the way to construction. Future steps would include final design and bid <br /> documents. Optional future steps could also include bid management, construction administration, and field <br /> inspections. Staff will provide a more detailed estimate of these future costs at the meeting. Staff is working with <br /> WSB to finalize these numbers. <br /> There are additional optional services to consider with this first step. A 3D model and animated fly-through could <br /> be added at an amount of$7,500. Additional renderings come at a cost of$2,500 per rendering. At this time, Staff <br /> is not recommending these additional services. Staff will re-evaluate at key points in the process and review with <br /> the City Council at that time. <br /> Alternative 41 -Recommend that the City Council approve the Work Order for Streetscape Design. <br /> Alternative 42 -Recommend that the City Council authorize a Request for Proposals (RFP). Given that the scope of <br /> services is less than $40,000,the City's Finance Policy does not require this step. These services fit in nicely with <br /> WSB's assistance with land use planning for The COR. <br /> Alternative 43 -Recommend that the City Council authorize design services,but complete in house. This step <br /> would extend the completion date of the design due to current workloads. Additionally,the City may lose out on <br />