My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.3 Geotechnical Considerations <br /> Northern Technologies, Inc. (NTI) was employed to complete a Geotechnical Exploration <br /> and Engineering Review for this project, which included thirteen (13) soil borings that <br /> were spaced at approximately 200 feet along Alpine Drive. The locations of the borings <br /> are shown in the Boring Location Diagram in Appendix C of NTI's report, attached in <br /> Appendix D. <br /> 4.1.4 Other Considerations <br /> Driveway <br /> Existing driveway aprons will need to be reconstructed to varying degrees with this <br /> project. The limits of construction will vary with each driveway apron based on the <br /> elevation of the street abutting the driveway and the driveway pavement type. During <br /> design, staff will evaluate the construction limits for each driveway and will incorporate <br /> this into the plans, but as with all street reconstruction projects the exact limits of <br /> construction will be determined in the field during construction. Right-of-entry forms <br /> will be obtained from private property owners if work is required outside City right-of- <br /> ways and easements. <br /> Irri ate ion Systems: <br /> Developed properties along the project corridor may have private irrigation systems. <br /> However, impacts to these systems would only occur if the existing curb and gutter is <br /> being removed and replaced. In the past,the City has typically repaired private irrigation <br /> systems that are damaged as part of a street reconstruction project. However, staff will <br /> be requesting Council permission to change this practice on all future projects by instead <br /> notifying property owners of pending construction at least 15 business days in advance to <br /> allow them time to move their irrigation systems out of harm's way before work begins. <br /> Parking Restrictions: <br /> Parking is currently provided intermittently along one side of the streets and is not <br /> currently restricted except for overnight parking per City code. During this project, <br /> parking will be restricted during allowable working hours. <br /> 4.2 Stormwater Treatment <br /> No stormwater retention and/or treatment improvements will be required as a result of this <br /> proj ect. <br /> 4.3 Water Main Improvements <br /> No watermain improvements are proposed with this project. <br /> 4.4 Sanitary Sewer Improvements <br /> No sanitary sewer improvements are proposed with this project. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.