My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FINANCING <br /> 5.1 Opinion of Cost <br /> A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br /> of this report. The opinion of probable costs incorporates anticipated 2017 construction costs for <br /> the proposed improvements plus 23% indirect costs for administrative, engineering, financing <br /> and legal costs. No construction contingency costs are included in the estimated costs. <br /> City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br /> NTI prepared the Geotechnical Exploration and Engineering Review, included in Appendix C, at <br /> a cost of$4,400. <br /> WSB and Associates, Inc. prepared the Pavement Evaluations and Recommendations included in <br /> Appendix D, at the not-to-exceed cost of$2,687.50. <br /> 5.2 Funding <br /> 5.2.1 Assessments <br /> The use of special assessments is not being proposed with this project. <br /> 5.2.2 City Contribution <br /> The City will fund this project in its entirety. No funds have been budgeted for this <br /> proj ect. <br /> The City's share of eligible project costs related to surface (street) improvements is <br /> proposed to come from the previously encumbered 5-year street reconstruction bonds. <br /> Stormwater Utility Funds would be utilized for all storm sewer improvements. <br /> Table 1 illustrates the proposed project funding based on the proposed design outlined <br /> within this report. This funding program assumes construction will occur in 2017. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-0I Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.