My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br /> City of Ramsey Improvement Project 17-01 proposes to reconstruct the bituminous pavement <br /> section, to remove and replace all damaged concrete curb and gutter, and to complete <br /> miscellaneous appurtenant work on Alpine Drive between Armstrong Boulevard and Variolite <br /> Street. This street segment measures approximately 3,600 linear feet(0.68 miles). <br /> It is the recommendation of City staff that City Project No. 17-01 is feasible, necessary, and cost- <br /> effective from an engineering standpoint. <br /> The following staff recommendations related to the proposed project are presented for Council <br /> consideration and concurrence: <br /> 1. Staff recommends reconstructing this street segment in 2017 as outlined in this report. <br /> 2. Staff recommends reconstructing the off-road bike trail along the south side of Alpine <br /> Drive at a later date pending adoption of the City's Trail Maintenance Policy/Program. <br /> 3. Staff recommends constructing the 10-ton pavement section for Alpine Drive as proposed <br /> herein to accommodate State Aid design standards. <br /> 4. Staff recommends requiring private property owners to protect and/or restore their own <br /> irrigation systems during future street improvement projects. <br /> 5. Staff recommends meeting with the owner of each property in early February of 2017 to <br /> inform them of the proposed improvements and to gather public input prior to requesting <br /> Council approval of plans and specifications on March 28tH <br /> The City Council is asked to act on the following items related to the proposed project: <br /> 1. Adopt Resolution#17-01-OXX accepting this Feasibility Report and ordering Plans and <br /> Specifications based on the design proposed herein. <br /> Feasibility Report <br /> Alpine Drive Reconstruction <br /> City of Ramsey Project No.I7-01 Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.