Laserfiche WebLink
MDEPARTMENT OF <br /> TRANSPORTATION <br /> MnDOT-led projects on Highways 10, 47, and 65 in Anoka County: December <br /> 2016 update Offered by Paul Jung, Metro District • (651) 234-7716 - paul.jung@state.mn.us <br /> Completed 2016 <br /> Hwy 10 New wear course between Hanson Blvd and University Avenue <br /> Hwy 47 Feasibility study for Ferry Street—BNSF Railway grade separation <br /> Safety improvement at 142nd Avenue <br /> Hwy 65 Access Management Plan: Bunker Lake Blvd to Isanti County line <br /> Reduced conflict intersection (RCI) study and educational video <br /> Microsurface* southbound lanes: 217th Avenue to County 10 <br /> On tap for 2017 <br /> Hwy 47 1 Preliminary design for Ferry Street—BNSF Railway grade separation <br /> Beyond 2017 <br /> Hwy 10 Install cable median barrier between Hwy 101 and Thurston Avenue <br /> (2018) <br /> Hwy 47 Mill and overlay between 27th Avenue and 40th Avenue (2018) <br /> Add northbound right turn lane at St. Francis Middle School (2020/21) <br /> Hwy 65 Replace storm sewer in west ditch from 0.1 mi. south of West Moore <br /> Lake Drive to 68th Avenue, replace storm sewer (2018) <br /> Construct signalized RCI at Viking Boulevard; construct non-signalized <br /> RCTs at 143rd, 153rd, 157th, 181st, and 187th (2018/2019) <br /> Lengthen left turn lanes at several signalized intersections (2018/19) <br /> Mill and overlay between County 10 and 153rd Avenue (2022) <br /> * Microsurface is a 3/8-inch thick layer placed atop the existing pavement. It's a mixture of asphalt, cement, <br /> and gravel. It improves safety, ride quality, and extends the pavement life. <br /> (over) <br />