My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required prior to reconstructing the pavement. However, if the City Council orders plans and <br /> specifications for the proposed improvements, staff proposes to hire a leak detection expert to <br /> ensure there are no detectable leaks. If leaks are detected, repairs would be made under separate <br /> contract before work commences on this project. <br /> 3.3 Sanitary Sewer <br /> Sanitary sewer was installed in 1996 under the pavement along the entire segment of Sunwood <br /> Drive. Staff believes the existing sanitary sewer is in good condition, and that no repairs will be <br /> required prior to reconstructing the pavement. However, if the City Council orders plans and <br /> specifications for the proposed improvements, staff proposes to hire a firm to televise the sewer <br /> to ensure the pipes are not deformed, cracked, or broken, and that all joints are sealed. If any <br /> issues are detected, repairs would be made under separate contract before work commences on <br /> this project. <br /> 3.4 Storm Sewer/Drainage <br /> Storm sewer exists along the entire segment of Sunwood Drive. Based on design calculations <br /> completed by City staff, no modifications are required to the existing storm sewer system to meet <br /> current State Aid standards. Stormwater runoff is currently conveyed within the concrete curb <br /> and gutter along the outside edges of Sunwood Drive,where it is then collected in concrete catch <br /> basins and routed through concrete storm sewer pipes to existing wetlands, stormwater drainage <br /> ditches, and ponding facilities. <br /> 3.5 Streets <br /> 3.5.1 Existing Typical Sections <br /> Sunwood Drive is centered within 80 feet of City-owned right-of-way. The street section <br /> is 40 feet wide from face-of-curb to face-of-curb. All curb along these streets are B618 <br /> concrete curb and gutter. <br /> Parking is currently allowed on both sides of the streets and is delineated with striping. <br /> 3.5.2 Maintenance History <br /> This segment of Sunwood Drive was originally constructed in 1996 and received a <br /> crackseal and sealcoat treatment in 2002. Spot patching has also been completed since <br /> then. <br /> 3.6 Land Use <br /> The properties abutting this segment of Sunwood Drive are all zoned El, with the exception of <br /> Cottonwood Park. <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.