My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.3 Geotechnical Considerations <br /> Northern Technologies, Inc. (NTI)was employed to complete a Geotechnical Exploration <br /> and Engineering Review for this project,which included eleven (11) soil borings that <br /> were spaced at approximately 200 feet along Sunwood Drive. The locations of the <br /> borings are shown in the Boring Location Diagram in Appendix C of NTI's report, <br /> attached in Appendix D. <br /> 4.1.4 Other Considerations <br /> Driveways: <br /> Existing driveways will need to be reconstructed to varying degrees with this project. <br /> The limits of construction will vary with each driveway based on the elevation of the <br /> street abutting the driveway and the driveway pavement type. During design, staff will <br /> evaluate the construction limits for each driveway and will incorporate this into the plans, <br /> but as with all street reconstruction projects the exact limits of construction will be <br /> determined in the field during construction. Right-of-entry forms will be obtained from <br /> private property owners if work is required outside City right-of-ways and easements. <br /> Irrigation Systems: <br /> All developed properties along the project corridor have private irrigation systems. <br /> However, impacts to these systems would only occur if the existing curb and gutter is <br /> being removed and replaced. In the past, the City has typically repaired private irrigation <br /> systems that are damaged as part of a street reconstruction project. However, staff will <br /> be requesting Council permission to change this practice on all future projects by instead <br /> notifying property owners of pending construction at least 15 business days in advance to <br /> allow them time to move their irrigation systems out of harm's way before work begins. <br /> Parking Restrictions: <br /> Parking is currently provided along both sides of the streets and is not currently restricted <br /> except for overnight parking per City code. During this project, parking will be restricted <br /> during allowable working hours. <br /> 4.2 Stormwater Treatment <br /> No stormwater retention and/or treatment improvements will be required as a result of this <br /> proj ect. <br /> 4.3 Water Main Improvements <br /> No watermain improvements are proposed with this project. <br /> 4.4 Sanitary Sewer Improvements <br /> No sanitary sewer improvements are proposed with this project. <br /> 4.5 Construction Methods <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.