My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 01/17/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:51:37 AM
Creation date
3/14/2017 2:12:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.2 City Contribution <br /> The City contribution to the project will include all funding in excess of the amount <br /> collected through special assessments to benefiting properties. No funds have been <br /> budgeted for this project. <br /> The City's share of eligible project costs related to surface (street) improvements is <br /> proposed to come from the previously encumbered 5-year street reconstruction bonds. <br /> Stormwater Utility Funds would be utilized for all storm sewer improvements. <br /> Special assessments would be used to pay back a portion of these costs based on the term <br /> of the special assessments as adopted by Council at the end of the project. <br /> Table 1 illustrates the proposed project funding based on the proposed design outlined <br /> within this report. This funding program assumes construction will occur in 2017. <br /> TABLE 1 <br /> Proposed Project Funding <br /> ASSESSMENTS CITY FUNDS TOTAL <br /> EstimatedCosts $151,750 $455,250 $607,000 <br /> Total Project Cost $607,000 <br /> Less Special Assessments - $151,750 <br /> Subtotal = $455,250 <br /> Less City Bonding Funds - $447,950 <br /> Subtotal = $7,300 <br /> Less Stormwater Utility Funds - $7,300 <br /> TOTAL Remaining Cost = $0 <br /> Feasibility Report <br /> Sunwood Drive Reconstruction <br /> City of Ramsey Project No.I7-00 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.