Laserfiche WebLink
Ramsey Highway 10 <br />Proposed Agenda <br /> <br />1.) <br /> <br />Highway 10 Redevelopment Study <br /> <br />1.1 Summary of previous Planning Process- How we got here. <br /> <br /> a. Comprehensive Plan Directions <br /> b. Planning Commission redevelopment analysis <br /> c. Hwy. 10 Corridor Coalition <br /> <br />1.2 Issues and Opportunities along Hwy. 10 <br /> <br /> a. Commuter Rail <br /> b. Evolution of 10 to limited access <br /> c. Potential River Bridge <br /> d. Rail crossings at grade <br /> e. Inefficient land use <br /> f. Image is bad <br /> <br />1.3 What should we do to prepare for future changes? And why prepare? <br /> <br />1.4 Future Workshops <br /> <br /> a. Evaluate a series of transportation/land use alternatives that respond to <br /> the issues and opportunities of the corridor. <br /> b. Refine a preferred alternative for further evaluation. <br /> <br /> <br />