My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 07/13/2000
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2000
>
Agenda - Parks and Recreation Commission - 07/13/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 10:00:21 AM
Creation date
3/21/2017 2:10:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
07/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br />RECOMMEND CONSTRUCTION OF COTTONWOOD TRAIL BRIDGE <br /> By: Mark Boos, Parks/Utilities Supervisor <br /> <br />Background: <br /> <br />As part of Connexus Energy's facility construction and development of the Business Park, the <br />City received the 27 acre Cottonwood Park. The open space is intended to benefit the <br />Commercial/Industrial business in the area as well as the expected residential uses. In 1997 staff <br />removed brush and graded the site for the bituminous trail. Approximately 90 feet of wetland <br />remained between the two ends of the 4,130' loop of path. The plan called for bridge at this <br />location. Staff has explored cost sharing the purchase and installation of a bridge with Connexus <br />Energy similar in design to the one at Emerald Pond Park. The estimated cost including concrete <br />abutments is between 15 and 20 thousand dollars. In part for this reason, the bridge has not been <br />constructed to date. <br /> <br />Observation: <br /> <br />With concern for cost, staff has designed a bridge that can be built on site for less than $4,000 in <br />materials - provided Connexus Energy can provide and install the power pole supports. <br />Connexus has agreed to the above and is willing to contribute additional labor. The Cottonwood <br />Parks development was funded by the Economic Development Fund (EDA). As part of the <br />original project, $4,000 earmarked for the bridge was unspent. While this expenditure was <br />approved earlier by City Council, it should remm for Council acknowledgement. Staff will have <br />at the meeting the plan and material list for the proposed bridge. <br /> <br />Commission Action: <br /> <br />Motion to approve the bridge design and recommend City Council authorize staff to complete <br />the Cottonwood Park bridge utilizing the previously designated $4,000 in EDA monies. <br /> <br />Reviewed by: <br />Parks/Utilities Supervisor <br />Finance Officer <br /> <br />Copies to: <br />City Administrator <br />Public Works Director <br /> <br />P & R: 07/13/00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.