My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2000
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2000
>
Agenda - Planning Commission - 07/10/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:23:00 AM
Creation date
3/21/2017 2:38:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br /> REQUEST FOR AN INTERIM USE PERMIT FOR A <br />TEMPORARY OFFICE STRUCTURE; CASE OF AMCOR PRECAST <br />By: Megan Wald, Community Development Assistant <br /> <br />Background: <br /> <br />On December 18, 1997, the City issued an interim use permit to Amcor Precast at 6640 Industry <br />Avenue N.W. for the utilization of a 24' x 60' modular office structure until June 1, 1999 to <br />complete their assessment of space needs and possibly developing the site as a permanent <br />locaiton. Amcor is requesting another 2 year interim use permit to continue utilizing a temporary <br />office structure on their property. <br /> <br />The following items are enclosed for your review: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />Site plan <br />Proposed Findings of Fact <br />Proposed Interim Use Permit <br /> <br />Observations: <br /> <br />The applicants are requesting another interim use permit to utilize the modular office structure <br />for an additional 2-year period. Amcor is currently going through a budget process and <br />finalizing design plans for permanent structures to be constructed on the parcel in the years 2001- <br />2003. The architect for the project will be Miller Architect. They are currently working on <br />designing a manufacturing facility, office building, and future manufacturing addition. <br /> <br />Amcor is looking into the possibility of receiving TIF assistance from the City. If Amcor would <br />receive TIF assistance, then they would most likely be able to build both the manufacturing and <br />office facility in the year 2000. In the event that TIF assistance is not available, Amcor would <br />phase their project over a 3-year period. <br /> <br />The City has previously granted permits for temporary structures in the commercial and <br />industrial areas to facilitate redevelopment, growth or relocation. Waste Management's permit <br />for a temporary office structure was issued to be in effect as long as it took for their final vertical <br />expansion (3 years with 4 six month extensions available). Listul's permit was granted for a one <br />year period while they developed plans to expand or relocate in Ramsey; they received a one <br />year extension. The School's permit was issued for a 2 year period to allow time to construct the <br />addition to Ramsey Elementary. Rehbein's permit for a modular dwelling at the Links was to <br />provide living quarters for the project superintendent during construction of the golf course. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.