My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/15/2000
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2000
>
Agenda - Public Works Committee - 02/15/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:27:29 PM
Creation date
3/23/2017 4:56:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/15/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW CAS : # <br /> <br />UPDATE ON YEAR 2000 CONSTRUCTION PROJECTS <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />This is intended to be the beginning of a periodic update of the Committee on the status of all <br />construction projects anticipated or underway during the current fiscal year. Attached is the <br />February status of projects. The project descriptions have been kept relatively short so that they <br />can be easily referenced. However, some of the projects do include other elements not listed in <br />the table. Fore example, the T.H. #47 STP project also includes Sunwood Drive and the sanitary <br />sewer and watermain extensions that are incidental to said project. I will also have available at <br />the meeting an illustrated schedule for these projects. <br /> <br />At the present time there are two projects which have yet to be initiated by selecting an engineer: <br />(1) the 143''d Avenue extension from Jaspar to C.R. #116, and (2) the comprehensive water utility <br />project which includes the elements of constructing a well house, designing connecting <br />watermain piping between the new well and tower and the existing system. Since the connecting <br />watermain fi'om the new well needs to be connected into the existing main on Ramsey <br />Boulevard, the scope of this work should also include the design of Sunwood Drive from the <br />well house to Ramsey Drive. The completion of Well No. 5 is a critical element, which will <br />require that this engineer be selected before mid-April. The selection of an engineer for the 143''d <br />project should be done as soon as possible to expedite an early completion. <br /> <br />The Storm Sewer Improvement 2000 project includes two separate storm water projects at this <br />time: the Juniper Ridge Drive project and the 164th Avenue storm sewer project. The need for an <br />additional storm project should be considered to best coordinate with the 2000 Street <br />Maintenance Program. The Flintwood subdivision is scheduled for bituminous overlay. <br />However, the drainage is very poor at the intersection of 142nd Avenue and Fluorine and Iodine <br />Streets. Unless these intersections are storm sewer, it might be anticipated that the overlay <br />would have a relative short life. Staff would propose a storm sewer project consisting of <br />installing storm sewer for this area prior to the overlay. A CIP sheet is attached to this case <br />illustrating this project. The cost is estimated to be $72,500 and would be funded through the <br />storm water utility. <br /> <br />Committee Action: <br /> <br />Motion to recommend adding the Flintwood storm sewer project to the 2000 storm drainage <br />utility projects. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Director of Public Works <br />Finance Officer <br /> <br />PW: 02/15/00 <br /> <br /> <br />