Laserfiche WebLink
PW CASE # <br /> <br />UPDATE ON WATER TOWER NO. 2 <br /> By Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />On Monday May 15, 2000, staff will be meeting with AEC Engineering to review the Project <br />Procedures Manual which is the first deliverable document under our contract with this firm for <br />the design and specifications for water tower No 2. We anticipate bringing the plan and <br />specifications to the City Council for bidding on May 23, 2000, and an award date of June 27, <br />2000. A review of direction given to the consultant earlier in the year was as follows: <br /> <br />1) <br /> <br />2) <br />3) <br /> <br />Bids should allow for a water spheroid (the style of the existing Ramsey tower) and the <br />hydropillar style (the style used by Champlin). <br />A three-color painting scheme might be anticipated. <br />Bids should be received for two completion dates: Late Fall 2001 and early Summer <br />2001. The Council can then evaluate the cost of completion in order to have the tank <br />serviceable to meet the demands of Summer 2001. <br /> <br />If as a result of the Monday review with AEC, there are any decisions necessary to finalize the <br />plans and specifications, City staff would present those issues to the committee. <br /> <br />Committee Action: <br /> <br />Based on outcome of AEC Project Procedures Manual review. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />Director of Public Works <br />Parks/Utilities Supervisor <br /> <br />PW: 05/16/00 <br /> <br />G:lusersiCily Shared FilelPWCommitteel2OOOht4ayhtpdate water tower#2.doc 05/12/00 <br /> <br /> <br />