Laserfiche WebLink
PW CASE # <br /> <br />PRESENTATION AND CONSIDERATION OF WATER TOWER LETTERING AND <br />COLOR SCHEME <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />The steel erection of Water Tower #2 has been underway since September and should be <br />completed over the winter months. Construction will resume in the spring, and painting which is <br />temperature and humidity dependant may start in early April 2001. Although there is some time <br />for making final decisions on color and letter style, it is advisable to begin such consideration <br />sooner than later. <br /> <br />I have attached a sketch illustrating the type of letter that is currently envisioned to be placed on <br />the tank. I will also have a palate that has over 250 color selections, along with brochures from <br />PDM, the tank manufacturer, which illustrates numerous examples of existing tanks. I have <br />invited Bob Kollmer from AEC Engineering to make a presentation at this meeting. I anticipate <br />he will also have some graphics for your viewing. <br /> <br />Committee Action: <br /> <br />Based on discussion. <br /> <br />Reviewed by: <br /> <br />Director of Public Works <br /> <br />PW: 11/21/00 <br /> <br /> <br />