Laserfiche WebLink
8 PROJECT COST BREAKDOWN: <br /> Identify each recreational trail/facility being proposed for funding. Provide a short quantitative <br /> description of the facility (linear feet, dimension of structures, number of components, etc.),the <br /> total estimated cost and the expected completion date for each. Include materials, landscaping, <br /> design/engineering services, contract service, etc. Add or delete rows in the text boxes below as <br /> appropriate. For acquisition projects, fill out the acquisition table. <br /> Trail/Facility Description Estimated Expected <br /> Cost Completion <br /> Date <br /> 150' x 10' Parking 7 vehicle parallel parking with ADA $4,978 2018 <br /> space <br /> ADA striping for Pavement striping adjacent to trail $200 2018 <br /> parking entrance <br /> ADA sign $185 2018 <br /> Sign, post and installation <br /> Truncated Domes 4 (four) 2' x 2' steel truncated dome $1,298 2018 <br /> panels in 3' x 10' concrete panel <br /> Bituminous trail connectors —on either $2,410 2018 <br /> 10' trail segments end of boardwalk/parking <br /> Boardwalk panels, 2 X 6 decking, 4 x $121,680 2018 <br /> 215, 8' x 8' 4's, galvanized hardware <br /> boardwalk sections <br /> $25,946 2018 <br /> 432 galvanized Standard boardwalk pans and upper <br /> brackets and pans brackets with galvanized hardware <br /> Curbing for $6,209 2018 <br /> boardwalk 2 x 4's and blocks with hardware <br /> Delivery 4 truckloads lumber and hardware $1,000 2017 <br /> All labor associated with actual $102,850 2018 <br /> Labor boardwalk construction contracted <br /> (Local administration costs are not included or <br /> accounted for anywhere in this application.) <br /> 2018 <br /> Total $266,756 <br />