My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/08/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 07/08/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:04:29 PM
Creation date
9/9/2004 2:43:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/08/1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOND cUT CRITERIA - <br />The corridors to be evaluated using the second cut criteria are shown <br />on Figure 1. The second cut criteria have some numerical <br />measures using available data. It should be emphasized, however, <br />that the evaluation measures are indicators only and are not <br />purported to be precise forecast volumes· The relative accuracy <br />is sufficient for ranking the corridors. Only available data <br />summaries, not new data were used in the evaluation. <br /> <br />The Second Cut Criteria and their measures are: <br /> <br />Market by Travel Shed <br />A. Forecasted Year 2000 person trip demand through the corridor <br /> of CBD bound travel <br /> Forecasted Year 2000 work trip demand through the corridor <br /> of CBD bound travel <br /> Forecasted Year 2000 work trip transit-usage through the <br /> corridor of CBD bound travel <br /> Present Transit usage through the corridor <br /> <br />Market by Subregion ~ <br />A. Forecasted Year 2000 person trip demand-Subregion to CBD <br />B. Forecasted Year 2000 person trip transit demand-Subregion to <br /> CBD <br />C. Forecasted Year 2000 work trip demand-Subregion to CBD <br />D. Forecasted Year 2000 trip transit demand-Subregion to CBD <br /> <br />3. Congestion forecasted in the corridor on the Metro Highway System <br /> <br />The evaluation rating and the measure for each criterion is <br /> summarized on Table 3. <br /> <br />The High and Medium ranked corridors from this evaluation were <br />considered to have met the second set of criteria. The seven highest <br />ranked corridors selected for the Third Cut Evaluation are: <br /> <br />A. St. Paul West and Minneapolis East which is the same corridor <br /> <br />C. Minneapolis South <br /> <br />D. Minneapolis West/Southwest <br /> <br />E. Minneapolis Northwest <br /> <br />F. Minneapolis Northeast <br /> <br />G. Minneapolis North <br /> <br />H. St. Paul North/Northeast <br /> <br />It is emphasized that when each corridor is qualified for the Third <br />Cut Evaluation that it has equal status with all of the qualified <br />corridors irrespective of the SeCond Cut numerical ranking. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.