My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/30/1980 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 09/30/1980 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:06:22 PM
Creation date
9/10/2004 12:26:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
09/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 4, ]980 <br /> <br />Re: <br /> <br />Pre-Construction Meeting <br />Improvement Project 80-13 <br />City of Ramsey <br /> <br />Location: Ramsey City Hall <br /> 15153 Nowthen Boulevard <br /> <br />Time: lO:~O A.M. <br /> <br />Present: <br /> <br />Name <br /> <br />Peter R. Raatikka <br />Merle Mevisson <br />William B. Miller <br /> <br />Discussion: <br /> <br />Fi rm <br /> <br />Consulting Engineers Diversified, Inc.. <br />Street Superintendent - Ramsey <br />N.D.H., Inc. <br /> <br />1. The contact personnel designated for the project are as follows: <br /> <br />Telephone No. <br /> 425-2181 <br /> 427-1410 <br /> 429-4900 <br /> <br />Ae <br /> <br />Owner: City of Ramsey <br />Representatives: Merle Mevissen, Street Supt. - 427-4180 <br /> Lloyd Schnelle, City Adm. - 427-1410 <br /> <br />Engineers: Consulting Engineers Diversified, Inc. <br />Project Manager: Peter R. Raatikka - 425-2181 <br />Resident Inspector: Brent Winters' <br /> <br />Prime Contractor: N.D.H., Inc. <br />Job Superintendent: William B. Miller <br />Job Foreman: Phil Halls <br /> <br />Communications: Contractor was requested to direct all communications related <br />to project to the project manager or resident inspector. <br /> <br />Schedule: Mr. William B. Miller stated he wodld start grading September 5th or <br />8th, 1980, and plans to complete the job by the end of the month. <br /> <br />Staking: The engineer will be providing the staking on the project. The <br />contractor stated he would require one set of blue tops for fine grading and <br />placing the gravel. <br /> <br />Pay Estimates: Contractor was instructed to have estimates to the engineer by <br />the Wednesday prior to the 2nd Tuesday of each month. <br /> <br />Special Problems and Instructions: The contractor was instructed to maintain <br />access to the residents and limit detours, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.