My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/30/1980 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 09/30/1980 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:06:22 PM
Creation date
9/10/2004 12:26:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
09/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor and Ci.ty Council <br />City of Ramsey <br />July 18, 1980 <br />Page 2 <br /> <br />To provide better drainage to the storm sewer and since portions of the ditches have <br />been filled in, we would reco~end that the streets be ultimately improved in accor- <br />dance with the City's standard urban street sections. For Rivlyn Avenue the standard <br />section would consist of a 31 foot wide street with concrete curb and gutter as shown <br />on plate no. RT501 and for Tungsten and Front Streets it would consist of a 41 foot wide <br />street as shown on plate.no. RT504. Estimated costs for the ultimate streets are shown <br />in Tables I and II along with proposed assessments for a typical lot 1OD feet in width. <br />Due to the large variation in lot sizes it is proposed to assess the streets on a front <br />foot basis. <br /> <br /> TABLE I ESTIMATED COSTS <br />URBAN STREETS FOR TUNGSTEN AND FRONT STREETS <br /> <br />Total Cost <br />Total Assessable Front Feet <br />Cost Per Front Foot <br />Cost Per 100 Foot Lot <br />Annual Cost Per 100 Foot Lot * <br /> <br />58,625 <br />1767 <br />33.18 <br />3318 <br />540.17 <br /> <br /> TABLE II ESTIMATED COSTS <br />URBAN STREET FOR RIVLYN AVENUE <br /> <br />Total Cost <br />Total Assessable Front Feet <br />Cost Per Front Foot <br />Cost Per 100 Foot Lot <br />Annual Cost Per 100 Foot Lot * <br /> <br />$ 26,125 <br /> 2071 <br />$ 12.61- <br />$ 1261 <br />$ 205.29 <br /> <br />*Based on 10% interest over 10 years <br /> <br />Since the proposed pro~ect is located in the 1990 Urban Service Area, we would not <br />recoanend construction of the streets to ultimate standards until services are <br />constructed. As an alternate to the ultimate street sections the City may wish <br />to consider the proposed suburban street section as shown on Exhibit B for Tun§sten <br />and Front Streets. For Rivlyn Avenue, we would not recommend any improvement other <br />than the drainage inlets to the storm sewer. Estimated costs for the proposed suburban <br />streets are shown in Table III. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.