Laserfiche WebLink
80-4 Halland Acres <br /> <br />Construction <br /> <br />Engineering, Staking, Inspection <br /> <br />Fiscal and Legal <br /> <br />Administrative and Escrow <br /> <br />Mi s c el lane ous <br /> <br />Total Cost <br /> <br />Number of Units <br /> <br />Cost Per Unit <br /> <br />$28,350. O0 <br />4,300.00 <br />270. O0 <br />1,000. O0 <br />250. O0 <br /> <br />$34,170. O0 <br />24 <br />$ 1,423.75 <br /> <br /> <br />