Laserfiche WebLink
d. Mailbox Locations. If the PERMITTEE desires to construct mailboxes <br /> within the public right of way,the PERMITTEE agrees that the placement <br /> of mailboxes along public streets is subject to the approval by the CITY. <br /> Utility locates will be necessary. <br /> e. Boulevard and Wetland Restoration. The PERMITTEE shall be <br /> responsible for the cost of establishing seed in all boulevards within thirty <br /> (30) days of the completion of the street improvements, and restoring all <br /> other areas disturbed by the development grading operation in accordance <br /> with the approved Grading and Erosion Control plan. The PERMITTEE <br /> shall be responsible for the cost of cleaning any soil, earth, or debris from <br /> the wetlands within and adjacent to this Plat resulting from grading <br /> performed in the development of the Plat. <br /> f. Construction, Hours and Entrance Signs. The CITY restricts construction <br /> and delivery hours to Monday through Saturday 7:00 a.m. to 10:00 p.m. <br /> The PERMITTEE is required to provide a sign at each entrance point <br /> stating delivery and construction operation hours. Said signs are not to <br /> exceed eighty(80)square feet in size and must be clearly visible at all times <br /> during the construction period. <br /> g. Construction Site Maintenance. The PERMITTEE shall adhere to all of <br /> the CITY ordinances relating to, but not limited to, dumping of garbage, <br /> site development, construction debris, open burning, etc. The CITY <br /> reserves the right to withhold permits, inspections, or certificates of <br /> occupancy to correct violations relating to construction site maintenance. <br /> h. Estimated Cost. It is understood and agreed that cost amounts set forth in <br /> this Agreement as to Stage I and Stage 11 Improvements,unless qualified as <br /> fixed amounts, are estimated. The PERMITTEE agrees to pay the entire <br /> cost of said improvements including interest, engineering and legal fees <br /> related thereto. <br /> i. Plat Approval Expenses, The PERMITTEE agrees that it will pay to <br /> CITY all CITY expenses incurred in the approval of the Plat, including, <br /> but not limited to,administration expenses, engineering and legal fees. Said <br /> expenses incurred after recording of the Final Plat shall also be paid within <br /> said fifteen (15) day billing period. Failure to pay the CITY'S expenses <br /> within the fifteen(15)day billing period will permit the CITY to draw upon <br /> any of the escrows required by this Agreement for payment. <br /> 7 <br />