My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> � HOMES � <br /> Brookfield 8t" Watermain Loop Determination <br /> Capstone Homes and the City of Ramsey have a longstanding, successful working relationship to provide <br /> exceptional homes to the residents of Ramsey. It is our desire to come to an agreeable solution regarding <br /> the watermain completion issue that has arisen during the planning process. We appreciate the City's <br /> willingness to consider cost sharing this aspect of the project given the long-term benefit that it will bring <br /> to the City of Ramsey as well as the residents of Brookfield Stn <br /> In the event that the City of Ramsey determines that it is willing to share cost of the watermain loop <br /> extension in the Brookfield 81h Addition with Capstone Homes,Capstone Homes would agree to cost share <br /> under the following circumstances: <br /> • The cost of the water main loop extension not to exceed $105,000.00. <br /> • Capstone and the City of Ramsey would each pay 50%of the cost. <br /> • The method of construction is a directional bore, Capstone would oversee the work of <br /> the project. <br /> Should the City determine that it is not interested in a cost share option to complete the watermain loop, <br /> it will be Capstone Homes' position to dead end the watermain for Brookfield 81h. Our engineers have <br /> determined that the water quality and safety will not be impacted once 20% buildout has been <br /> accomplished for the 25 lots in Brookfield 81n <br /> How - is the Water on Your - <br /> Insert Information about Your Dead-End(s)Below in the YELLOW Cel Is to Find Out <br /> Ste• • - g FACTS ABOUT UNCIRCULATING <br /> WATER <br /> Ste <br /> •EPA recommended minimum <br /> • Two: 0.28 disinfectant residual is.S mg/L <br /> (level varies by state) <br /> •Within 200 hours(8.3 days) <br /> • • of - Pipe 3,860 disinfectant residuals begin to <br /> dissipate and drop <br /> • Three: 5 •Disinfectant byproducts(DBPs) <br /> can begin to form within 4-7 days. <br /> If the cell 122 is greater than 4,the <br /> water may begin to become unsafe <br /> • • -• - 2,110 for consu mers <br /> •Kupferle's EPA Approved <br /> Automatic Flushing Systems(AFS) <br /> Days to Consume Uncirculated Water1.2 keep residuals consistent and <br /> reduce the threat of DBPs forming <br /> by removing old water.AFS flush <br /> less water more often and help <br /> Estimated - - 2 keep water safe for co nsumers. <br /> F—Automatic Flushing Solution <br /> 800-231-3990 <br /> 1 http://hydrants.com/water-quality-calculator. <br /> Capstone Homes, Inc. <br /> 14015 Sunfish Lake Blvd NW, Suite 400 <br /> Ramsey, MN 55303 <br /> Office: (763) 427-3090 Fax: (763) 712 -9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.