My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement for Professional Services <br /> This Agreement made on the 21 th day of October, 2016, between City of Ramsey(hereinafter"City") and Short <br /> Elliott Hendrickson Inc. (hereinafter"Consultant"). <br /> This Agreement authorizes and describes the scope, schedule, and payment conditions for Consultant's work on <br /> the Project titled Well House 3 Standby Generator Design, generally described as the engineering design and <br /> support for the addition of a permanently installed standby generator to Well House No. 3. The project is divided <br /> into three phases for the Design, Quotation, and Construction of this work. <br /> Scope: The Basic Services to be provided by Consultant as set forth herein is provided subject to the attached <br /> General Conditions of the Agreement for Professional Services (General Conditions Rev. 07.14.16), which is <br /> incorporated by reference herein and subject to Exhibits attached to this Agreement. <br /> Phase 1 — Design Phase <br /> • Complete generator sizing calculation for standby natural gas generator. Contact vendors to verify sizing, <br /> cost of unit and preliminary foot print. <br /> • Prepare construction documents for new standby generator consisting of drawings and electrical <br /> specifications <br /> • Prepare opinion of probable cost for the installation of the standby generator. <br /> Phase 2—Quotation Phase <br /> • Assist the City in obtaining quotations from a minimum of three (3)qualified contractors <br /> • Respond to questions from prospective contractors <br /> • Issue necessary addenda to Project Construction Documents <br /> • Review submitted quotes and provide recommendations to the City <br /> • Assist the City in the award of the Project <br /> Phase 3—Construction Phase <br /> • Set-up and attend a pre-construction meeting <br /> • Provide review of Shop Drawings <br /> • Respond to RFIs submitted <br /> • Review Contractor's Applications for Payment <br /> • Review of Operation & Maintenance Manuals <br /> • Attend generator test <br /> • Prepare a Punch List <br /> • Perform final inspection <br /> Services Provided by the City: The City shall provide the Consultant with the following services: <br /> • Provide drawings of the existing facilities <br /> Schedule: The anticipated schedule for the completion of work described in the scope is described below: <br /> Action Item Scheduled Date <br /> Commence Design Upon approval of proposal <br /> Prepare construction documents and Opinion of Probable Cost Within five weeks of approval of proposal <br /> Receive quotations from contractor Within nine weeks of approval of proposal <br /> Award contract Within twelve weeks of approval of proposal <br /> Construction: <br /> Project Close-Out Within five months of award of contract <br /> Compensation for Services: The fees for each phase have been determined and are described below: <br /> Phase 1 Engineering Fees: The Consultant shall complete Phase 1 —Design efforts on an hourly basis for a Not- <br /> to-Exceed Fee of$8,800, which includes reimbursable expenses. <br /> Short Elliott Hendrickson Inc. Letter Agreement- 1 City of Ramsey <br /> (Rev. 07.14.16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.