My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br /> Background: The Pearson Farms Development is proposed for construction on the vacant <br /> land bounded by Puma Street, Alpine Drive, Trunk Highway (TH) 10, and Links at Northfork <br /> Golf Course in Ramsey, Minnesota. This development will include 344 total residential units <br /> (98 townhomes and 246 single family homes). The purpose of this study is to determine the <br /> traffic impacts associated with the build out of the proposed development on the study <br /> intersections. <br /> Results: The principal findings of this traffic study are: <br /> • The proposed expansion is expected to generate approximately 2,912 new trips <br /> during an average weekday (1,456 entering and 1,456 exiting), approximately 227 <br /> new trips during the a.m. peak hour(53 entering and 174 exiting)and approximately <br /> 297 new trips during the p.m. peak hour (189 entering and 108 exiting). <br /> • The existing study intersections operate with acceptable delays and vehicle queues <br /> today. <br /> • The study intersections are expected to operate acceptably during the 2040 no- <br /> build and build scenarios. <br /> • Left turn lanes are not warranted based on the expected 2040 build year volumes <br /> and mainline speeds. <br /> • Right turn lane warrants are not fulfilled due to the mainline speeds remaining below <br /> 45 MPH, which is consistent for neighborhood streets, however, the right turn lane <br /> volume thresholds were reached by the estimated 2040 Build volumes. <br /> Recommendations: The following items are recommended based on the analyses <br /> contained in this study: <br /> • No additional intersection mitigation is required to help improve capacity. <br /> • If the speed limits along Puma Street or Alpine Drive are increased to 45 MPH or <br /> higher, re-evaluate the Turn-Lane Warrants. <br /> • Construct a new sidewalk/trail along the southern edge of Alpine Drive connecting <br /> the proposed access to the existing Alpine Drive/Puma Street intersection. The <br /> addition of a north/south crosswalk should also be considered at this intersection <br /> to help promote safe crossing to the existing northern sidewalk/trail. <br /> • Ensure the proposed internal sidewalks connect to the external sidewalk/trail <br /> system. <br /> • Work with Metro Transit or their affiliates to improve transit options within the project <br /> area as the closest existing transit is located roughly 1.5 miles away at Ramsey <br /> Station and Platform. <br /> This study is based upon a concept plan from January 6, 2017. Assuming the general <br /> characteristics of the proposed development remain approximately the same as <br /> documented, minor changes in the final design are not expected to alter the results or <br /> recommendations of this study. <br /> Traffic Impact Study i CONSULTING <br /> Pearson Farm Residential Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.