My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix G: Capacity Analysis Backup <br /> Generated with <br /> Version 5.00-00 CONSULTING <br /> Intersection Level Of Service Report <br /> Intersection 1:Alpine Drive&Puma Street <br /> Control Type: Two-way stop Delay(sec/veh): 9.0 <br /> Analysis Method: HCM 2010 Level Of Service: A <br /> Analysis Period: 15 minutes Volume to Capacity(v/c): 0.002 <br /> Intersection Setup <br /> Name <br /> Approach Northbound Eastbound Westbound <br /> Lane Configuration "r �"► i <br /> Turning Movement Left Right Thru Right Left Thru <br /> Lane Width[ft] 12.00 12.00 12.00 12.00 12.00 12.00 <br /> No.of Lanes in Pocket 0 0 0 0 0 0 <br /> Pocket Length[ft] <br /> Speed[mph] 30.00 40.00 40.00 <br /> Grade[%] 0.00 0.00 0.00 <br /> Crosswalk Yes Yes Yes <br /> Volumes <br /> Name <br /> Base Volume Input[veh/h] 2 0 53 6 0 43 <br /> Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 <br /> Heavy Vehicles Percentage[%] 2.00 2.00 2.00 2.00 2.00 2.00 <br /> Growth Rate 1.00 1.00 1.00 1.00 1.00 1.00 <br /> In-Process Volume[veh/h] 0 0 0 0 0 0 <br /> Site-Generated Trips[veh/h] 0 0 0 0 0 0 <br /> Diverted Trips[veh/h] 0 0 0 0 0 0 <br /> Pass-by Trips[veh/h] 0 0 0 0 0 0 <br /> Existing Site Adjustment Volume[veh/h] 0 0 0 0 0 0 <br /> Other Volume[veh/h] 0 0 0 0 0 0 <br /> Total Hourly Volume[veh/h] 2 0 53 6 0 43 <br /> Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 <br /> Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 <br /> Total 15-Minute Volume[veh/h] 1 0 13 2 0 11 <br /> Total Analysis Volume[veh/h] 2 0 53 6 0 43 <br /> Pedestrian Volume[ped/h] 10 10 10 <br /> Scenario 1: 1 Existing AM Peak <br /> Traffic Impact Study G2 Spack Consulting <br /> Pearson Farm Residential Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.