My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix G: Capacity Analysis Backup <br /> Generated with <br /> Version 5.00-00 CONSULTING <br /> Vistro File: C:\...\Pearson Farm Model.vistro Scenario 6 2040 Build AM Peak <br /> Report File: C:\...\2040_Build AM.pdf 3/7/2017 <br /> Intersection Analysis Summary <br /> ID Intersection Name Control Type Method Worst Mvmt V/C Delay (s/veh) LOS <br /> 2 Puma Street& Bunker Lake Two-way stop HCM 2010 SB Thru 0.000 14.0 B <br /> Boulevard <br /> 3 Alpine Drive &Okapi Street Two-way stop HCM 2010 NB Thru 0.000 18.9 C <br /> 4 Puma Street& Northern Site Two-way stop HCM 2010 WB Left 0.071 14.9 B <br /> Access <br /> 5 Puma Street &Southern Site Two-way stop HCM 2010 WB Left 0.075 15.5 C <br /> Access <br /> 6 j Alpine Drive & Site Accessj Two-way stop j HCM 2010 j NB Left j 0.021 j 11.0 B <br /> V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for <br /> all other control types, they are taken for the whole intersection. <br /> Scenario 6:6 2040 Build AM Peak <br /> Traffic Impact Study G36 Spack Consulting <br /> Pearson Farm Residential Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.