Laserfiche WebLink
A <br /> WSB <br /> 701 Xenia Avenue South I Suite 300 1 Minneapolis,MN 55416 1 (763)541-4800 <br /> Memorandum <br /> To: Tim Gladhill, City of Ramsey <br /> From: Breanne Rothstein, WSB &Associates, Inc. <br /> Alison Harwood, WSB &Associates, Inc. <br /> Date: March 30, 2017 <br /> Re: Capstone Homes (Riverstone Addition)EAW Review <br /> WSB Project No. 01973-350 <br /> On behalf of the City of Ramsey, WSB &Associates, Inc. has reviewed the Pearson Farm Residential <br /> Development EAW for compliance with requirements. The following comments were noted during our <br /> review: <br /> 1) Project Title <br /> • Page 1 — Include the location in the project title. <br /> 5) Project Location <br /> • Page 2— For residential development, it is recommended that grading, drainage, or other plans <br /> be attached if available. <br /> 6) Project Description <br /> • Page 2— Figures 3 and 4 show the proposed site plan and a maximum density site plan, but both <br /> are referenced for the proposed site plan. Consideration should be made to distinguish between <br /> the two in the project description <br /> 11) Water Resources <br /> • Page 11 —for the Table 6, Appendix B reference, the formatting makes it seem like Table 6 is <br /> located in Appendix B. Consider reformatting by possibly using semicolon or ampersand symbol. <br /> • Page 11 — Include a table that shows the location of the wellhead protection area or other <br /> sensitive water management areas. <br /> • Page 16 — in the Surface Waters section, include measures taken to avoid or minimize impacts <br /> to wetlands, such as an alternatives analysis. <br /> 12) Contamination/Hazardous Materials/Waters <br /> • Page 18— Include a figure for the WIMN database listings. <br /> 17) Noise <br /> • Page 23—With the project adjacent to TH 10 a noise analysis should be considered to <br /> document the need for future noise walls.Although this is not a requirement, in the future <br /> if issues arise MnDOT will not participate in funding of needed walls. It will be the local <br /> responsibility. <br /> 18) Transportation <br /> • Page 24—This section should be updated based on the Traffic Study comments. <br /> Figures <br /> • On the site plan the access at Bunker Lake Blvd shows a center median. In order to provide lane <br /> continuity Bunker Lake Blvd will need to be widened. <br /> Appendix E <br /> 1. Introduction: <br /> • Page 1 —the study only include analysis at the intersections closest to the development. <br /> Consideration should be given to also evaluating for regional impacts: <br /> o Bunker Lake Blvd at Armstrong Blvd <br /> o Alpine Dr at Armstrong Blvd <br /> Building a legacy—your legacy. <br /> Equal Opportunity Employer I wsbeng.com <br /> \Wiles0l\projects\01973-350VAdmin\Docs\1973-350-Memo-Capstone Homes EAW Review-033017.dou <br />