My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/11/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:31:41 PM
Creation date
4/10/2017 9:28:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
754
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> Project 61700969 <br /> March XX,2017 <br /> Page 4 <br /> DRAFT <br /> ■ Installed five temporary monitoring wells in five of the soil borings(S-1,S-4,S-6,S-8,and S-9) <br /> and collected groundwater samples. <br /> ■ Installed three temporary soil vapor probes(SG-1 through SG-3) and collected soil vapor <br /> samples. <br /> ■ Conducted environmental monitoring during drilling and screened soil samples collected <br /> from the borings for the presence of organic vapors using a photoionization detector(PID). <br /> Visual and olfactory observations regarding potential contamination were also made and <br /> recorded. <br /> ■ Analyzed representative samples of soil,vapor,and groundwater for one or more of the <br /> following parameters:Volatile organic compounds(VOCs), polycyclic aromatic hydrocarbons <br /> (PAHs),gasoline range organics(GRO),diesel range organics(DRO),and Resource <br /> Conservation and Recovery Act(RCRA) metals. <br /> ■ Evaluated the data and prepared this report. <br /> Investigation locations are shown on Figure 2 and soil boring logs are included in Appendix A. <br /> D. Deviations from Work Plan/Proposal <br /> The proposal included 12 soil borings: 5 to be completed as temporary monitoring wells and 7 to be <br /> advanced by the former fueling dispensers. However,sampling under the dispensers was conducted as <br /> part of the concurrent tank removal activities. Instead of the 7 dispenser borings,4 shallow(8 feet deep) <br /> soil borings were advanced for general coverage of the Site. <br /> E. Investigation Methods and Procedures <br /> The field work relating to the Phase II ESA investigation was conducted on March 13,2017. Prior to <br /> beginning the field investigation, public utilities were cleared through Gopher State One Call and private <br /> utilities were cleared through a subcontracted private utility locator. <br /> Soil boring rationale and analytical testing parameters are summarized in Section E.1.c.The locations and <br /> ground surface elevations of soil borings,temporary monitoring wells,and soil vapor probes were <br /> BRAUN <br /> INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.