Laserfiche WebLink
Alta Survey: An ALTA Survey was completed and is provided as part of this report. The survey does <br /> not indicate any concerns for the development of the property. <br /> Title Commitment: The title commitment has been completed and indicates there are no concerns <br /> with the city's ownership. The complete title commitment and supporting documentation is included as <br /> part of this report. <br /> Geotechnical Tests: Haugo Geotechnical Services (HGTS) performed a standard penetration test <br /> boring on January 4, 2016. The boring location was selected and staked in the field by Hakanson <br /> Anderson. The test soil borings were performed in general accordance with ATSM Specification D-1586 <br /> procedures.The soil boring encountered a foot of topsoil underlain by generally native granular soils to <br /> the termination depths of the borings. Groundwater was encountered in each boring at depths of 5 to 8 <br /> feet below the surface, correlating to elevations of 854 to 856 MSL. <br /> Utility Information: The site is currently served by public utilities. The following specifications may <br /> be adjustable depending on project demand. <br /> -Water: 6" watermain, adjacent(in 143rd Avenue NW) [City of Ramsey, 763-433-9825] <br /> -Sewer: 6" line, adjacent (in 143rd Avenue NW) [City of Ramsey, 763-433-9825] <br /> -Gas: 60 psi in a 4" plastic line, (in Ramsey Blvd) [Jake Schwietering, Centerpoint Energy, 763-323-2685] <br /> -Fiber: Available adjacent (in Bunker) [Comcast, 651-755-2602] [Century Link, 651-312-5387] [Zayo, 952- <br /> 857-9383] <br /> -Electricity: 12.5kV voltage available with up to 4 MW service [Connexus Energy, 763-785-5432] <br />