Laserfiche WebLink
Review File:Preliminary Plat and Variance:Homestead Road Subdivision <br /> Comprehensive Plan and Zoning Code Review <br /> Page 4 of 4 <br /> Tree Inventory must be added to the grading plan and must specify the intended fate of each tree (saved or <br /> preserved). This will also assist in determining whether any additional landscaping is required. <br /> The inventory does indicate that there are oaks present on the Subject Property. As noted above though,it <br /> is unclear whether any site improvements would occur within vicinity of these trees. Due to concerns with <br /> Oak Wilt, any clearing within a stand of oak trees shall be completed prior to April 15 or after July 15. If <br /> construction activities will occur within this stand of oaks, an Oak Wilt Management Plan could be <br /> prepared outlining steps that would be taken to prevent the introduction and spread of Oak Wilt beyond the <br /> Subject Property. <br /> Topsoil: Each individual lot will need to have four (4) inches of topsoil meeting the City's topsoil <br /> specification. A topsoil inspection is required prior to landscaping being installed and copies of the load <br /> tickets are required as well. This is reviewed at time of Building Permit Application and request for <br /> Certificate of Occupancy for each individual lot. There shall not be any fill (topsoil or sod)placed within <br /> any designated wetland or flood zone. <br /> Development Fee Calculations: Development Fees will be due on the Plat. A DRAFT of the Development <br /> Fees is as follows: <br /> Fee Type Units Unit Type Unit Price Total <br /> Park Dedication(0-12 units per acre) 2 Per unit $2,800 $5,600 <br /> Trail Development 2 Per unit $800 $1,600 <br /> Water Fees(Trunk/Connection) 3 Per unit $1,925* $5,160 <br /> Water Fees(Lateral) 3 Per acre TBD TBD <br /> Sewer Fees(Trunk/Connection) 3 Per unit $1,154 $3,462 <br /> Sewer Fees(Lateral) 3 Per acre TBD TBD <br /> Stormwater Management 2 Per unit $473 $946 <br /> Street Light(Cobra) TBD Per light $1,300 TBD <br /> Street Light(3 Year O&M) TBD Per light $294 TBD <br /> Sewer Availability Charges(SAC) 3 Per SAC Unit $2,485 $7,455 <br /> Water Availability Charges(WAC) 3 Per WAC Unit $1,236 $3,708 <br /> *Per the Water Main and Sanitary Sewer Cost Contribution/Reimbursement Agreement <br /> Development Agreement: Upon approval of a Final Plat, an executed Development Agreement will be <br /> required prior to releasing the plat for recording. <br />